dc.description.abstract | The installation of wind power technology is growing steadily and the trend can be expected to continue if the objectives proposed by the European Commission are to be achieved. In some countries a considerable percentage of installed wind power capacity is near the end of its useful lifetime. In the case of Spain, the figure is 50% within five years. Over the last 20 years, wind energy technology has evolved considerably and the expected capacity factor has improved, thus increasing annual energy production, and capital expenditure and operational expenditure have decreased substantially. This paper studies the optimal decision under uncertainty between life extension and full repowering for a generic wind farm installed in the Iberian Peninsula when the future hourly electricity prices and the capacity factor evolve stochastically and seasonally. The results show that in economic terms, full repowering is the best option, with a net present value of 702,093 per MW installed, while reblading is the second best option. The methodology can be transferred to other specific wind farms in different electricity markets and can be used to develop national wind energy policy recommendations to achieve projected shares in the electricity mix. © 2021 by the authors. Licensee MDPI, Basel, Switzerland. | es_ES |
dc.description.sponsorship | Special thanks are due to Borja Vallejo from Vestas, Madrid, Spain, and Javier Echarte from GE Renewable Energy, Barcelona, Spain, for their guidance in understanding the wind turbine industry. Funding: This research was funded by the Basque Government through the BERC 2018–2021 programme and by the Spanish Ministry of the Economy and Competitiveness (MINECO) through BC3 María de Maeztu excellence accreditation MDM-2017-0714. Further support is provided by the MINECO project RTI 2018-093352-B-I00. | es_ES |
dc.language.iso | eng | es_ES |
dc.publisher | Energies | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/3.0/es/ | * |
dc.subject | Capacity factor | es_ES |
dc.subject | Electricity price | es_ES |
dc.subject | Electricity price | es_ES |
dc.subject | Repower | es_ES |
dc.subject | Repower | es_ES |
dc.subject | Wind power | es_ES |
dc.title | Old wind farm life extension vs. Full repowering: A review of economic issues and a stochastic application for Spain | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.rights.holder | © 2021 by the authors. Licensee MDPI, Basel, Switzerland | es_ES |
dc.rights.holder | Atribución-NoComercial-CompartirIgual 3.0 España | * |
dc.relation.publisherversion | https://dx.doi.org/10.3390/en14123678 | es_ES |
dc.identifier.doi | 10.3390/en14123678 | |
dc.contributor.funder | BERC | |
dc.contributor.funder | Borja Vallejo | |
dc.contributor.funder | GE Renewable Energy | |
dc.contributor.funder | Barcelona | |
dc.contributor.funder | Spain | |
dc.contributor.funder | Basque Government | |
dc.contributor.funder | Spanish Ministry of the Economy and Competitiveness | |