Search
Now showing items 1-3 of 3
A Methodology to Evaluate the Reliability Impact of the Replacement of Welded Components by Additive Manufacturing Spare Parts
(MDPI, 2019-08-26)
This article shows a method for inspection scheduling of structures made by additive manufacturing, derived from reliability function evaluations and overhaul inspection findings. The routine was an adaption of an existing ...
Inspection scheduling based onreliability updating of gas turbinewelded structures
(Sage, 2019-01-28)
This article presents a novel methodology for the inspection scheduling of gas turbine welded structures, based on reliability calculations and overhaul findings. The model was based on a probabilistic crack propagation ...
Load distribution and friction torque in four-point contact slewing bearings considering manufacturing errors and ring flexibility
(Elsevier, 2019-03-16)
This work introduces a methodology for the calculation of the load distribution in four-point contact slewing bearings
considering ball preload, manufacturing errors and ring flexibility. The model is built by the formulation ...